top of page

FINAL CHAPTER...

Frank Sinatra offers his reporting on the matter

January 2, 2022, the tree comes down. Yes,

you may have already seen this quick video.

#1 First cut

#2 Peeking through

#3  Old sign gets trimmed up

Old Sign trimmed up.jpg

#4 Muscles Rick, Jim, Terry and Jeff begin to set the sign.

#4 SADLY it is determined the interior of the sign is in worse shape than we thought. 

Sign in bad shape.jpg

#5  Since there is enough lumber from the tree to make a new sign, the log was cut and its pieces

needed to be moved around. 

 

Ray O'Brien saves the day with his loader. 

 

Thank you RAAAAYYYY!

Ray Loader 1(1).JPG
Ray Loader 2.JPG

#6 Rigging to make the first cut.

Log and Rigging.JPG

#7  First cut successful.  Jeff sharpens his blades for the second cut.  The wood is in PERFECT condition.... PERFECT CONDITION!!!    Whihooo! !!  !!!!!

#8  Second cut successful.  Coraline, Frank's sister, supervises the work.  Shows us we "missed a spot."  (not)

#9  Old Sign on New Sign.  A PERFECT FIT.  PERFECT width FIT!  Can Divine Intervention be ANY MORE OBVIOUS TODAY???

Jeff blade sharpening.JPG
Sign on Sign.JPG

#10 Trimming up the opening for

the new sign. 

#11  Leverage.  Push.  Wiggle.

#12  More hands on deck.  This took quite a few attempts.

#13  Pete workin' hard.

Pete Workin' Hard.jpg

WE ARE ON SCHEDULE... sorta

...slight delay

 

TO DO:

​

#1.  Transport sign to new contractor in Truckee. Transport sign back to Timberland property.  Paint/stain. 

​

#2.  Firm up date for Crane for installation.

​

#3.  Assemble sign to new post; grunt, push, wiggle n giggle.

 

#4. Arrange Cal Trans/Sheriff for traffic control the day of installation. 

​

#5.  Installation. 

​

I will keep you posted on installation date. 

If you see this video first, scroll up

Our Sign Gets Installed 10/14/23
1 min 40 seconds

Final Page.  Promise

bottom of page